#fdio-meeting: FD.io CSIT Project Meeting
Meeting started by mackonstan at 15:00:39 UTC
(full logs).
Meeting summary
-
- Juraj Linkeš (jlinkes,
15:01:37)
- Tibor Frank (tifrank,
15:03:23)
- Agenda bashing (mackonstan, 15:03:28)
- Inputs from projects - VPP (mackonstan, 15:03:45)
- Andrew - no updates, in the full swing of
v23.06 dev cycle (mackonstan,
15:04:13)
- Inputs from projects - TSC (mackonstan, 15:04:27)
- mackonstan - voted ok for vexxhost to donate
and/or dispose of old equipment (mackonstan,
15:05:48)
- VPP and CSIT (not so hot) items (mackonstan, 15:06:54)
- Peter - dealing with Georgii's request "convert
job_specs to robot commands" - waiting for Georgii (mackonstan,
15:07:19)
- CSIT-2302 release (mackonstan, 15:07:55)
- Tibor - testing going well, iterative tests
almost done, coverage tests started, all test data is pushed into
draft report in master and ofc into csit.fd.io c-dash (mackonstan,
15:08:53)
- https://docs.fd.io/csit/master/report/
(mackonstan,
15:09:24)
- csit.fd.io (mackonstan,
15:09:30)
- Tibor, Maciek - rls notes patch is open - pls
review and comment (mackonstan,
15:09:56)
- 38366: report: update VPP rls notes section | https://gerrit.fd.io/r/c/csit/+/38366
(mackonstan,
15:10:38)
- https://gerrit.fd.io/r/c/csit/+/38366
(mackonstan,
15:10:54)
- Maciek TODO need to add rls notes for dpdk and
trex (mackonstan,
15:11:16)
- Tibor will be including csit.fd.io links
specific to v23.02 testing (mackonstan,
15:12:00)
- Vratko re RCAs - for PDR 1c - results look as
expected (mackonstan,
15:12:50)
- Vratko re RCAs - for NDR 1c - 3n-tsh some
fluctuations (mackonstan,
15:13:34)
- Vratko re RCAs - MRR, NDR, PDR 2c, 4c - 3n-snr
values jumping between values (mackonstan,
15:15:10)
- Physical Infrastructure (mackonstan, 15:16:31)
- Peter - SPR build is ongoing (mackonstan,
15:17:12)
- mackonstan - network cables are to be shipped
by Intel and Nvidia this/next week (mackonstan,
15:17:39)
- mackonstan - once SPR servers and testbeds are
installed, and 3n-alt testbed is free, will be scheduling putting
cx6 nics into 3n-alt (mackonstan,
15:22:17)
- Juraj - Lijian asking about what VPP drivers
will the cx6 cards be tested with => mackonstan: On Xeon
platforms CSIT is now testing cx5 cards with both RDMA_CORE and DPDK
drivers. I expect the same for cx6 and cx7 cards, unless there are
other suggestions. (mackonstan,
15:27:46)
- Virtual Infrastructure, CI/CD (mackonstan, 15:28:01)
- mackonstan Dave reported on VPP call yesterday
about CI job queue buildup caused by the volume of CSIT jobs
stressing the newly re-provisioned Nomad clusters. Issue got
fixed. (mackonstan,
15:29:16)
- Peter - working with Dave to adjust the Nomad
resource allocation per VPP and CSIT jobs to better reflect the
actual needs and improve efficiency of Nomad scheduler (mackonstan,
15:31:30)
- Trending and Test Failures (mackonstan, 15:31:54)
- Vratko - no new failures spotted. (mackonstan,
15:32:01)
Meeting ended at 15:32:05 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (33)
- collab-meetbot` (9)
- jlinkes (1)
- tifrank (1)
- dwallacelf (0)
- vrpolak (0)
Generated by MeetBot 0.1.4.