14:05:29 #startmeeting FD.io CSIT Project Meeting 14:05:29 Meeting started Wed Apr 5 14:05:29 2023 UTC and is due to finish in 60 minutes. The chair is mackonstan. Information about MeetBot at http://wiki.debian.org/MeetBot. 14:05:29 Useful Commands: #action #agreed #help #info #idea #link #topic #startvote. 14:05:29 The meeting name has been set to 'fd_io_csit_project_meeting' 14:05:59 #chair dwallacelf jlinkes vrpolak mackonstan tifrank 14:05:59 Warning: Nick not in channel: dwallacelf 14:05:59 Warning: Nick not in channel: jlinkes 14:05:59 Warning: Nick not in channel: vrpolak 14:05:59 Warning: Nick not in channel: mackonstan 14:05:59 Warning: Nick not in channel: tifrank 14:05:59 Current chairs: dwallacelf jlinkes mackonstan tifrank vrpolak 14:06:02 #info Tibor Frank 14:06:04 #info Dave Wallace 14:06:14 #info juraj linkeš 14:06:18 #topic Inputs from VPP 14:07:04 #info Andrew - nothing to report 14:07:12 #topic Inputs from TSC 14:07:36 #info Dave - nothing new from TSC 14:08:57 #topic E810 flow "offload" tests 14:09:08 #info Kai - nothing outstanding AFAICT 14:10:12 #info Maciek - to check status of vpp-device tests for dpdk offload flags. 14:10:21 #topic VPP and DPDK version 14:10:58 #info Dave, on the last VPP call asked Jeff Shaw to help with tracking the dpdk bump patch 14:12:08 #info 37840: dpdk: bump to dpdk 22.11 | https://gerrit.fd.io/r/c/vpp/+/37840 14:12:20 #link https://gerrit.fd.io/r/c/vpp/+/37840 14:12:33 #info Kai, team hit some issues with this patch 14:13:09 #info Kai, issue is with cryptodev 14:17:10 #info Kai, confirmed that Gabriel is fixing memory leak in cryptodev.c, and once fixed Xinyao will be updating dpdk to 22.11 and/or straight to 23.03 14:18:14 #topic Previous Release 14:18:25 #topic Previous Release CSIT-2302 14:19:02 #topic Next Release CSIT-2306 14:19:19 #info mackonstan, release schedule posted, aligned with VPP 14:19:49 #link https://docs.fd.io/csit/rls2302/report/ 14:20:37 #topic Physical Infrastructure 14:22:15 #info Peter, SPR supermicro server RMA - confirmation received that it may take up to 90 days 14:22:27 #info no other issues with physical HW 14:32:58 #info Peter, working on 2n3n testbeds support in CSIT code (2n physical testbed, wired in 3n setup, vpp per numa) 14:33:54 #info Dave, we need SPR machines for device tests, as some VPP patches that require SPR HW accelerators (specifically DSA) are waiting for VPP device test validation before being merged into vpp master 14:34:26 #info Dave, Maciek to discuss options how to address it with available HW, and order more SPR HW soon as per original plan of record for 2023 14:35:38 #info Maciek, still need to follow up on mlx cx6 NIC allocation to 3n-alt and icx testbeds 14:36:35 #topic Trending and Test Failures 14:38:04 #info Peter, recovered ICX testbeds (tests were failing), there is something broken in the SW stack, need to t/shoot and RCA 14:38:58 #info Peter, Maciek, rdma tests failing intermittently, need to t/shoot and RCA 14:42:28 #link https://jira.fd.io/browse/CSIT-1877 14:42:32 #link https://gerrit.fd.io/r/c/csit/+/38550 14:42:36 #info Juraj, re slow boot of VMs on Taishan testbeds, some problem with core scheduling while VM booting, current fix is to pin the cpus while VM is booting 14:43:14 #info Juraj, tested the patch on Taishan and 2n-clx testbeds 14:44:52 #endmeeting