#fdio-meeting: FD.io CSIT Project Meeting

Meeting started by mackonstan at 14:02:17 UTC (full logs).

Meeting summary

    1. Juraj Linkeš (jlinkes, 14:02:42)
    2. Vratko Polak. (vrpolak, 14:02:43)
    3. mackonstan (mackonstan, 14:04:22)

  1. Agenda bashing (mackonstan, 14:04:24)
  2. VPP updates (mackonstan, 14:05:06)
    1. Andrew - dpdk bumping to v23.03 discussed in vpp call yday, plan is to have vpp v23.06 to ship with dpdk 23.03. (mackonstan, 14:05:55)
    2. Andrew - 2 weeks away from rc1. (mackonstan, 14:06:09)

  3. TSC updates (mackonstan, 14:07:54)
    1. Vratko - Vanessa reporting issues with jjb upgrades, will try again (mackonstan, 14:08:11)

  4. E810 flow "offload" tests - device tests (mackonstan, 14:09:58)
    1. Kai - followed on the email pointing out to the old, now abandoned, 35743: [DO NOT MERGE] dpdk: VPP own DPDK flags | https://gerrit.fd.io/r/c/vpp/+/35743 (mackonstan, 14:11:29)
    2. Kai - the issue hasn't been addressed, so adding the backlog (mackonstan, 14:11:42)

  5. PP and bumping DPDK to 23.03 (mackonstan, 14:12:48)
    1. Kai - patch pushed, awaiting review - 38772: dpdk: bump to DPDK 23.03 | https://gerrit.fd.io/r/c/vpp/+/38772 (mackonstan, 14:13:30)
    2. https://gerrit.fd.io/r/c/vpp/+/38772 (mackonstan, 14:13:37)
    3. Kai - waiting for maintainer, Damjan to +2 (mackonstan, 14:15:08)
    4. Peter - going ahead with NIC firmware upgrades and drivers (mackonstan, 14:15:41)
    5. Kai - another patch related to bumping dpdk to 23.03 - 38771: dpdk: code preparation for bumping to DPDK 23.03 | https://gerrit.fd.io/r/c/vpp/+/38771 (mackonstan, 14:19:27)
    6. https://gerrit.fd.io/r/c/vpp/+/38771/1 (mackonstan, 14:19:39)

  6. Performance RCAs (mackonstan, 14:23:07)
    1. https://gerrit.fd.io/r/c/vpp/+/38304 (vrpolak, 14:23:30)
    2. Vratko - re vpp-2072, patch pushed but -1'ed, see above link (mackonstan, 14:23:35)

  7. Next Release CSIT-2306 (mackonstan, 14:25:14)
    1. Vratko - updated mlrsearch code is too new for the release (mackonstan, 14:25:44)
    2. Vratko - reassembly tests - working reliably on subset of testbeds running without hyperthreading, as multi-threading NDR performance is extremely low, PDR is okay (mackonstan, 14:27:28)
    3. Vratko - will open new ticket once enough data collected about going-ons (mackonstan, 14:27:49)
    4. Kai - planning to merge wireguard 10k tests, backlog from last release (mackonstan, 14:29:09)

  8. Physical Infrastructure (mackonstan, 14:29:44)
    1. Peter - 3vn-spr will be ready for testing release (mackonstan, 14:30:05)

  9. Trending and Test Failures (tifrank, 14:31:56)
  10. Analytics, Presentation (tifrank, 14:32:37)


Meeting ended at 14:34:40 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (28)
  2. collab-meetbot (9)
  3. tifrank (3)
  4. vrpolak (2)
  5. jlinkes (1)
  6. dwallacelf (0)


Generated by MeetBot 0.1.4.