14:07:31 <mackonstan> #startmeeting FD.io CSIT Project Meeting 14:07:31 <collab-meetbot`> Meeting started Wed Aug 2 14:07:31 2023 UTC and is due to finish in 60 minutes. The chair is mackonstan. Information about MeetBot at http://wiki.debian.org/MeetBot. 14:07:31 <collab-meetbot`> Useful Commands: #action #agreed #help #info #idea #link #topic #startvote. 14:07:31 <collab-meetbot`> The meeting name has been set to 'fd_io_csit_project_meeting' 14:08:11 <mackonstan> #chair dwallacelf jlinkes vrpolak mackonstan tifrank 14:08:11 <collab-meetbot`> Warning: Nick not in channel: dwallacelf 14:08:11 <collab-meetbot`> Warning: Nick not in channel: jlinkes 14:08:11 <collab-meetbot`> Warning: Nick not in channel: vrpolak 14:08:11 <collab-meetbot`> Warning: Nick not in channel: mackonstan 14:08:11 <collab-meetbot`> Warning: Nick not in channel: tifrank 14:08:11 <collab-meetbot`> Current chairs: dwallacelf jlinkes mackonstan tifrank vrpolak 14:09:07 <jlinkes> #info Juraj Linkeš 14:09:23 <vrpolak> #info Vratko Polak. 14:09:28 <mackonstan> #topic Agenda bashing 14:10:09 <mackonstan> #topic Project updates - VPP 14:11:51 <mackonstan> #info Andrew - vpp v23.10 schedule published - to be reviewed on the next vpp-dev call 14:11:56 <mackonstan> #link https://wiki.fd.io/view/Projects/vpp/Release_Plans/Release_Plan_23.10#Release_Milestones 14:12:35 <mackonstan> #info rc1 2023-09-20; rc2 2023-10-11 (RC1+21); formal release 2023-10-25 (RC2+14) 14:15:12 <mackonstan> #info Andrew - asking Kai to connect 1-1 to discuss continuous tracking of dpdk integration with vpp 14:18:35 <mackonstan> #info Kai - agree. Already working on bumping dpdk version patch to dpdk v23.07. ETA mid August. 14:18:49 <mackonstan> #topic Project updates - TSC 14:21:04 <mackonstan> #info Maciek - presented new look of CSIT rls report based on csit.fd.io dashboard. good feedback, recommendation from TSC to use LFN FD.io webinar to present to wider community. 14:21:48 <mackonstan> #topic New or refactored 14:23:00 <mackonstan> #info Kai - E810 flow "offload" tests - in backlog. Team from PRC (Yulong, Marvin) re-allocated to other tasks, working on onboarding a new team. 14:23:15 <mackonstan> #topic VPP and CSIT (not so hot) items 14:25:09 <mackonstan> #info Kai - SPR QAT2.0 - Peter has addressed init issues: QAT bind under CSIT has been fixed; QAT installation dependency has been fixed; QAT code to initialize cryptohw in CSIT has been fixed. 14:26:47 <mackonstan> #info Peter - tests are initializing okay but tests are failing, packets dropped on VPP " esp4-encrypt-tun: crypto engine error (packet dropped)" 14:27:07 <mackonstan> #info Kai - looking into that. 14:28:13 <mackonstan> #info Kai - re SPR DSA - still waiting for formal bios rls from supermicro (v1.3 or v1.4) - soon be available soon. Once available, will test it with Georgii to verify all works, before confirming back to CSIT team. 14:29:31 <mackonstan> #info Peter - SNR QAT2.0 - still having issues with initializing driver. Driver missing after installing QAT bundle (not loading, or missing, PCI binding failing). 14:30:21 <mackonstan> #info Kai - may need a debug session with Peter. Tomorrow works. 14:30:58 <mackonstan> #info Peter - e810 gtpu - failed to initialize gtpu offload on e810. 14:34:04 <mackonstan> #topic Previous Release 23.06 14:34:36 <mackonstan> #info Tibor - all testing done. 14:35:42 <mackonstan> #info Vratko - RCAs - no updates on identified issues. Need to complete description on which testbeds issues happen. Still working through coverage tests - so far no updates. 14:36:11 <mackonstan> #topic Next Release 23.10 14:36:27 <mackonstan> #info Maciek - dpdk ver bumping confirmed by Kai - see note above. 14:37:04 <mackonstan> #info Maciek - will update CSIT 23.10 wiki with CSIT rls dates aligned with vpp rls schedule per update from Andrew - see note above. 14:37:35 <mackonstan> #topic Physical Infrastructure 14:38:50 <mackonstan> #info Peter - re outstanding SPR SM motherboard RMA - vexxhost ticket got updated by Vexxhost - shipment is imminent, but no ETA specified. 14:39:50 <mackonstan> #topic VPP API tracking 14:41:26 <mackonstan> #info Vratko - Andrew contributed a set of patches (5-6) bumping api msg versions to move to production. but waiting for Dave W to trigger last call for reviews from vpp-dev, and then merge. ETA next week or two. 14:41:40 <mackonstan> #topic Trending and Test Failures 14:42:31 <mackonstan> #info Vratko - some new failures, e.g. ipsec sw async tests, emailed vpp-dev (csit-dev on cc:) 14:42:52 <mackonstan> #link https://wiki.fd.io/view/CSIT/TestFailuresTracking 14:43:12 <mackonstan> #info see item 3.1.1.1 in above 14:43:39 <mackonstan> #info looks like vpp issue 14:44:09 <mackonstan> #info CSIT-1928 14:45:08 <mackonstan> #info Kai - will update re team picking up the ipsec sw (and hw) async tests 14:46:52 <mackonstan> #info Vratko - another set of tests failing with TRex ASTF and NAT44ed UDP only, not TCP; suspecting TRex ASTF code. 14:48:16 <mackonstan> #info Vratko - two issues fixed - 4.1 and 4.2 in the wiki link above. 14:48:53 <mackonstan> #topic Analytics, Presentation. 14:49:13 <mackonstan> #info Tibor - few bug fixes in csit.fd.io dashboard 14:50:59 <mackonstan> #info Tibor - updating python libraries versions and requirements - usual "hygiene" after rls. Peter: need to update code for json data models (unavoidable). 14:52:06 <mackonstan> #endmeeting