#fdio-meeting: FD.io CSIT Project Meeting
Meeting started by mackonstan at 14:00:33 UTC
(full logs).
Meeting summary
- Agenda bashing (mackonstan, 14:07:09)
- Inputs from projects - VPP (mackonstan, 14:07:22)
- Andrew - 23.10 vpp rls dates final (mackonstan,
14:07:49)
- VPP and CSIT (not so hot) items - HW accelerator (mackonstan, 14:08:56)
- Marko - SPR QAT - t/shooting sessions are in
progress, repro in progress in Intel labs (after getting scripts
from Peter) (mackonstan,
14:09:48)
- Mark - SNR QAT2.0 - issue with initializing qat
devices - feedback from intel dev team - most likely cpu issue - one
in csit lab has 5 qat2.0 accelerator units, and working units in
intel labs have 6 qat2.0 accelerator units. would require processor
replacement. (mackonstan,
14:11:18)
- Marko Kovacevic (above as Marko, Mark(o),
proxying for Kai) - will work with john digiglio re SNR processor
replacement. (mackonstan,
14:12:11)
- Marko - was expecting SuperMicro bios new rls
this week, will work with Georgii to validate, and then confirm back
to csit (mackonstan,
14:12:49)
- Next Release CSIT-2310 (mackonstan, 14:15:06)
- Marko - vinayx.tripathi is working on
validating ipsec scenarios with dpdk v23.07, dpdk plugin may require
patching (mackonstan,
14:16:47)
- Maciek - dpdk bump patch got merged by Dave
Wallace yesterday, as it was verifying (mackonstan,
14:17:11)
- 39352: dpdk: bump to DPDK 23.07 | https://gerrit.fd.io/r/c/vpp/+/39352
(mackonstan,
14:17:20)
- Maciek, Marko - Marko to ask Vinay to send a
note to vpp-dev and csit-dev re ongoing patch work for ipsec dpdk
v23.07, and/or push gerrit patch (mackonstan,
14:19:12)
- Physical Infrastructure (mackonstan, 14:19:44)
- Maciek - Peter reported 4 x new SPR servers
arrived from SM, being installed (mackonstan,
14:20:02)
- VPP API tracking (mackonstan, 14:20:49)
- Vratko, Andrew - updating vpp api messages,
patches still open, waiting for any last comments, and then waiting
for Dave Wallace to do +2 (mackonstan,
14:21:37)
- Trending and Test Failures (mackonstan, 14:21:49)
- Vratko - ipsec sw async tests - vpp hanging ...
now not hanging any more, but ndrpdr results are very low. most
likely due to using vpp interface adaptive mode as a default. fixing
it now on both vpp side and csit side. (mackonstan,
14:25:10)
- Vratko - hoststack 3n-icx cx6 tests down issue
- csit-1927 - Peter fixed ip address, should be working now, to be
confirmed (mackonstan,
14:26:35)
- Vratko - checking dpdk bump impact - dpdk ipsec
tests are passing, but all avf tests are failing - to be
t/shooted (mackonstan,
14:27:58)
- Vratko - for next meeting - add agenda item -
request to add more cipher variations to ipsec tests (mackonstan,
14:29:40)
Meeting ended at 14:30:07 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (25)
- collab-meetbot` (9)
- dwallacelf (0)
- jlinkes (0)
- vrpolak (0)
- tifrank (0)
Generated by MeetBot 0.1.4.