#fdio-vpp: fdio vpp

Meeting started by DaveBarach at 14:57:05 UTC (full logs).

Meeting summary

    1. Dave Wallace (dwallacelf, 15:00:38)
    2. valderrv (valderrv, 15:04:27)
    3. csit design refactoring doc available (DaveBarach, 15:04:54)
    4. virl upgrade continuing, some hiccups this week (DaveBarach, 15:05:20)
    5. ssh connectivity issues (DaveBarach, 15:05:33)
    6. pls email csit dev if you encounter e.g. an ssh-related csit failure (DaveBarach, 15:06:09)
    7. working with Intel on Purely launch (new Xeon) (jong_, 15:06:49)
    8. netconf perf test in progress (DaveBarach, 15:07:49)
    9. https://wiki.fd.io/view/CSIT/Honeycomb/HC_performance (DaveBarach, 15:08:16)

  1. NSH/SFC no report (DaveBarach, 15:09:06)
  2. Florin reports on ONE-LISP (DaveBarach, 15:09:17)
    1. FDS requests LISP static-routing (DaveBarach, 15:09:47)
    2. bugfixes related to FDS and Honeycomb reports (DaveBarach, 15:10:22)

  3. Host Stack (DaveBarach, 15:10:27)
    1. TCP stack: sack-based loss recovery (DaveBarach, 15:10:49)
    2. refactor congestion-control handling (DaveBarach, 15:11:20)
    3. detailed performance work in progress (jong_, 15:17:29)
    4. RC1 date on Thursday 6/22 (jong_, 15:19:46)
    5. ensure comm to downstream projects (eg. Honeycomb) (jong_, 15:23:40)
    6. plugin install next Monday, config later next week (DaveBarach, 15:25:14)
    7. Containerized POC. progressing well, waiting for some boxes (jong_, 15:28:53)
    8. : re - maint. releated to a local root vulnerability (valderrv, 15:28:54)
    9. mini submit at Kubecon (jong_, 15:33:01)

  4. VPP -> RedHat REL (DaveBarach, 15:33:33)
    1. driverctl assigns NICs to dpdk / kernel (DaveBarach, 15:33:47)
    2. run w/ selinux enabled (DaveBarach, 15:34:41)
    3. Billy looking for expert help within RH (DaveBarach, 15:34:56)
    4. run as non-root (in progress) (DaveBarach, 15:35:20)
    5. LTS release support (DaveBarach, 15:36:03)
    6. "when might we see vpp in REL?" q from Ray K (DaveBarach, 15:37:08)
    7. most likely in an accessible channel / SKU, as a tech preview (DaveBarach, 15:37:40)
    8. Billy working through getting a date for the tech preview (DaveBarach, 15:37:58)

  5. Ray reporting on NSH/SFC (DaveBarach, 15:57:36)
    1. danny / hongjun vxlan optimizations, classifier functional test added to csit, to go into 17.07 (DaveBarach, 15:58:12)


Meeting ended at 15:59:16 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. DaveBarach (27)
  2. jong_ (15)
  3. collabot` (3)
  4. valderrv (2)
  5. dwallacelf (1)


Generated by MeetBot 0.1.4.