#onap-int: ONAP integration weekly meeting 18/09/2019

Meeting started by morgan_orange at 13:00:21 UTC (full logs).

Meeting summary

  1. call role (morgan_orange, 13:00:41)
    1. afenner (morgan_orange, 13:01:37)
    2. Marcin (morgan_orange, 13:01:40)
    3. Marco (morgan_orange, 13:01:43)
    4. Michal (morgan_orange, 13:01:49)
    5. Morgan (morgan_orange, 13:01:51)
    6. Brian (morgan_orange, 13:01:53)
    7. Daniel (morgan_orange, 13:02:00)
    8. Ruoyu (morgan_orange, 13:03:59)

  2. Action points follow-up (morgan_orange, 13:04:25)
    1. http://ircbot.wl.linuxfoundation.org/meetings/onap-int/2019/onap-int.2019-09-11-13.01.html (morgan_orange, 13:05:34)
    2. AP1: unconference ofr integration team in Antwerp: planned (morgan_orange, 13:06:02)
    3. AP2: plan discussion with SO for gating still in progress (morgan_orange, 13:06:19)
    4. CDS: story created in JIRA (morgan_orange, 13:06:27)

  3. Labs for testing (morgan_orange, 13:06:46)
    1. SB04: latest + patch to SDC & VID for HTTPS (morgan_orange, 13:07:08)
    2. new bug in DCAE => DCAEGEN2-1789 (morgan_orange, 13:07:51)
    3. latest => latest release version (morgan_orange, 13:08:11)
    4. SB04: long duration will be done here (morgan_orange, 13:08:55)
    5. release daily frozen due to SDNC issue => SDNC 1.7.2 not available (JIRA SDNC-917) (morgan_orange, 13:09:24)
    6. once SDNC is back => daily will be re-enabled (morgan_orange, 13:10:02)
    7. on master currently failures on Portal, SDNC, APPC and OOF-CDSO on E// and Orange platforms (OOM Master) (morgan_orange, 13:11:04)
    8. Brian sends a mail to TSC to indicate we are 1 week behind for Release Candidate (morgan_orange, 13:11:37)
    9. we still do not have release versions for all the components => Brian opened JIRA (morgan_orange, 13:12:51)
    10. look for Need RC0 Container JIRA created on JIRA (morgan_orange, 13:13:11)
    11. functionnaly we have the latest containers - 1 patch (SDNC) (morgan_orange, 13:14:38)
    12. RC0 not started as we do not have all the containers (morgan_orange, 13:15:17)
    13. pair wise testing not finalized, still major components not really ready for tests (morgan_orange, 13:17:47)
    14. https://wiki.onap.org/display/DW/0%3A+Integration+Weather+Board+for+El+Alto+Release (morgan_orange, 13:18:08)
    15. big patch on HTTPS call for SDC (morgan_orange, 13:20:03)
    16. https://gerrit.onap.org/r/c/oom/+/95514 (morgan_orange, 13:20:06)
    17. ACTION: morgan_orange move healthdist results in healthcheck stage (morgan_orange, 13:24:38)
    18. 95514 good patch but dcae image is missing (morgan_orange, 13:26:18)
    19. ACTION: in verify job, we should check that the images do exist in the Nexus (morgan_orange, 13:27:29)
    20. ACTION: Marcin create a JIRA for the missing images (morgan_orange, 13:30:42)
    21. a script shall already exist to get the list of the images (morgan_orange, 13:31:21)
    22. discussion on branching process (morgan_orange, 13:35:51)
    23. ACTION: Jim Baker: track that all components have created an el alto branch to be sure of the version, tag 5.0.0 (morgan_orange, 13:36:39)
    24. official charts for testsuite is in submodule testsuite/oom (morgan_orange, 13:37:53)
    25. we hsould delete wrong el-alto branch (but we do not have the rights to do), Daniel opened a ticket (morgan_orange, 13:39:26)
    26. once DCAE issue is fixed, SB00 should be reinstalled (release) (morgan_orange, 13:41:34)
    27. Lukaz reported a patch on appc APPC-1737 (morgan_orange, 13:43:21)
    28. problem also reported also on oof: redeploy failed, chart in FAIL status need to be purged before a reinstallation (morgan_orange, 13:47:53)
    29. action morgan_orange open a jira on OOF (new docker should be available ..) (morgan_orange, 13:58:42)
    30. ACTION: morgan_orange sync with Christophe to see if it is possible to use ATT Azure cloud pabailities to launch SO gating (morgan_orange, 13:59:08)
    31. vCPE testing: early testing (using the workaround for SDNC) could be done (morgan_orange, 14:00:25)
    32. use case follow up (morgan_orange, 14:01:43)
    33. https://wiki.onap.org/display/DW/2%3A+El+Alto+Release+Integration+Testing+Status (morgan_orange, 14:02:20)
    34. good progress in HPA vFW/vDNS (morgan_orange, 14:02:36)

  4. AoB (morgan_orange, 14:04:01)
    1. TSC meeting tomorrow: we will report that we did not start RC tests as RC dockers are not all available (morgan_orange, 14:05:15)


Meeting ended at 14:06:25 UTC (full logs).

Action items

  1. morgan_orange move healthdist results in healthcheck stage
  2. in verify job, we should check that the images do exist in the Nexus
  3. Marcin create a JIRA for the missing images
  4. Jim Baker: track that all components have created an el alto branch to be sure of the version, tag 5.0.0
  5. morgan_orange sync with Christophe to see if it is possible to use ATT Azure cloud pabailities to launch SO gating


Action items, by person

  1. morgan_orange
    1. morgan_orange move healthdist results in healthcheck stage
    2. morgan_orange sync with Christophe to see if it is possible to use ATT Azure cloud pabailities to launch SO gating
  2. UNASSIGNED
    1. in verify job, we should check that the images do exist in the Nexus
    2. Marcin create a JIRA for the missing images
    3. Jim Baker: track that all components have created an el alto branch to be sure of the version, tag 5.0.0


People present (lines said)

  1. morgan_orange (53)
  2. collabot` (3)


Generated by MeetBot 0.1.4.