13:03:45 #startmeeting integration weekly meeting 09/10/2019 13:03:45 Meeting started Wed Oct 9 13:03:45 2019 UTC. The chair is Guest30199. Information about MeetBot at http://wiki.debian.org/MeetBot. 13:03:45 Useful Commands: #action #agreed #help #info #idea #link #topic. 13:03:45 The meeting name has been set to 'integration_weekly_meeting_09_10_2019' 13:04:18 #topic participants 13:04:24 #info Gerard Nugent 13:04:28 #info afenner 13:04:33 #info Raj Gumma 13:04:35 #info Marco 13:04:38 #info Lasse 13:04:57 #info Krzystof 13:05:14 #info Brian 13:05:20 #info Eric Multanen 13:05:25 #info Mariusz 13:05:36 #info Zhulia 13:05:37 #info Zu 13:05:40 #info Morgan 13:06:20 #topic action point follow up 13:06:31 #info AP1: Lukasz create a JIRA to see if the bug (policy portal not reachable) is a feature 13:06:43 #info AP2: all upgrade the test status page 13:06:47 #info done 13:07:13 #info AP3: Marco open a JIRA to clamp 13:07:32 #info done, bunch of issues identified by Marco, still some issues are pending 13:07:50 #info AP4: marco sycn with ajay on the status of use case 13 13:08:23 #info mail exchanged, no update from ajay - Catherine also followed up => status page update planned before the end of the week 13:08:48 #info AP5: brian sync with Catherine on use case 17 (BBS) 13:09:08 #info page to be updated 13:09:16 #info AP6: all review integration Epic list for frankfurt 13:09:25 #info see next section 13:10:12 #topic El Alto last miles 13:10:25 #info testing status 13:10:27 #link https://wiki.onap.org/display/DW/2%3A+El+Alto+Release+Integration+Testing+Status 13:10:44 #info vFW completed 13:11:01 #info vCPE shoudl be OK before the end of the week 13:11:14 #info now most of the tests are PASS/COMPLETED 13:12:28 #info manual scale out => manual scale works (direct call to SO) but without VID (not possible for El Alto => Frankfurt) 13:12:58 #info automated closed-loop based with CDS: need to sync with yuirj possible timing issues 13:15:40 #info on VID issue => maybe some design involved, not a simple config change => move to frankfurt. 13:16:00 #action Marco/Brian sync with Itay on the possibility to get a patch release for VID / Scale out 13:16:24 #info clamp workign hard to fix scale out use case 13:18:20 #info OPTFRA-608 ticket create Error in Homing with multiple policies => promoted to Highest (blocking for use case vFW/vDNS HPA) 13:18:57 #info Change Management - Flexible Designer & Orchestrator => could be ok for the end of the week 13:22:48 #info K8S based Cloud Region Support - vFW Use case: blocked by different SO/Multicloud issues, fixes provided, => wait for the docker before retesting 13:24:04 #info K8S based Cloud Region Support - EdgeXFoundry Use case - blocked by the same SO issue (SO-2357), fix provided. 13:26:03 #info full healthcheck OK on Ericsson lab last Tuesday 13:27:06 #info SO 1.5.3 expected for friday (include vCPE fixes) 13:28:21 #info pypi python-test-utils no more empty. Fix provided yesterday and cherry-picked on el-alto to get a 0.5.1 version 13:28:58 #topic lab status 13:29:34 #info integration release dealy frozen, waith for So and SDNC snapshot 13:31:36 #info oversubcription changed in windriver lab 13:32:01 #action morgan get results from vmtp/shaker on windriver lab after this major config change 13:32:20 #info E/// lab => all healthcheck tests are PASS 13:32:45 #info sometimes an issue with a VNFM driver timeout 13:33:31 #info OOF tenant not impacted by the last changes 13:35:58 #info Orange lab unracked/reracked in the new DC. Wait for network reconfiguration 13:36:50 #info in // work on Azure in progress, some issues (limited number of vCPU). We observed that some operations (devstack deploypement, teardown) looks sometimes slower than with private cloud 13:37:52 #info patch for the 72h test provided. (robot not infra problem) 13:38:47 #info working on robot in progress 13:39:01 #info tests done on dedicated longetivity lab 13:40:13 #info results reported on onapci.org 13:42:07 #action all review the doc and update the rst accordingly (remove dublin reference) 13:44:14 #action review also the wiki page on the test status 13:44:33 #action morgan add 2 columns to the table: doc OK, CI candidate 13:44:36 #topic admin 13:44:52 #info el alto to be cut today 13:45:32 #info PTL election: a page has been created 13:46:12 #link https://wiki.onap.org/display/DW/Integration+PTL+election+Frankfurt 13:50:47 #topic Frnakfurt epic review 13:50:53 #undo 13:50:53 Removing item from minutes: 13:51:04 #topic Frankfurt epic review 13:51:54 #info including more automated test in daily chains 13:58:30 #info PTl meeting => review of CSIT planned 14:04:45 #endmeeting