#opnfv-bottlenecks: Bottlenecks Meeting 20180613

Meeting started by gabriel_yuyang at 03:20:50 UTC (full logs).

Meeting summary

  1. Plugfest Summary (gabriel_yuyang, 03:21:01)
    1. monitoring dashboard was shown in the long duration session (gabriel_yuyang, 03:21:58)
    2. key metrics and components have not been identified yet (gabriel_yuyang, 03:22:22)
    3. some metrics depends on the deployments, we currently focus on the common settings (gabriel_yuyang, 03:22:59)
    4. 2 of bottlenecks tests were executed during plufest which last 1 day and 4 hours, respectively (gabriel_yuyang, 03:23:57)
    5. Issues of hypervisor and rabbitmq were found and action items were assigned on Gabriel to dig deep for the root cause (gabriel_yuyang, 03:24:57)
    6. long duration tests have also been considered in gating CD process (gabriel_yuyang, 03:31:42)
    7. According gating CD process discussion, there are 3 gates: 1) developer 2) lab 3) advanced, LDT has been considered in 2) and 3) and the stability gate (gabriel_yuyang, 03:32:50)
    8. For G release, only developer and lab gates are considered since we are not running LDT on current CI (gabriel_yuyang, 03:33:29)

  2. Bottlenecks Release Plan (gabriel_yuyang, 03:33:56)
    1. Bottlenecks plan to introduce k8s stress testing in G release and investigtion on AI testing/analysis (gabriel_yuyang, 03:34:39)
    2. Bottlenecks will integrate NFVbench to support Traffic Generator and run tests simultaneously in storage network and data plane (gabriel_yuyang, 03:36:10)
    3. we still investigating the possibilities to have more interns for testing results visualization and k8s monitoring (gabriel_yuyang, 03:38:26)
    4. analysis of system under long duration tests should be provided and existing bottlenecks should be advised (gabriel_yuyang, 03:43:09)

  3. AoB (gabriel_yuyang, 03:43:49)
    1. LC3 will be held in the week after next week, one of topic cooperated by Bottlenecks and Barometer projects had been accepted (gabriel_yuyang, 03:44:49)
    2. will go the LC3 for the presentation (gabriel_yuyang, 03:45:05)


Meeting ended at 04:11:48 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. gabriel_yuyang (20)
  2. collabot_ (3)
  3. OPNFV-Gerrit-Bot (2)


Generated by MeetBot 0.1.4.