================================================ #opnfv-bottlenecks: Bottlenecks Meeting 20180613 ================================================ Meeting started by gabriel_yuyang at 03:20:50 UTC. The full logs are available at http://ircbot.wl.linuxfoundation.org/meetings/opnfv-bottlenecks/2018/opnfv-bottlenecks.2018-06-13-03.20.log.html . Meeting summary --------------- * Plugfest Summary (gabriel_yuyang, 03:21:01) * monitoring dashboard was shown in the long duration session (gabriel_yuyang, 03:21:58) * key metrics and components have not been identified yet (gabriel_yuyang, 03:22:22) * some metrics depends on the deployments, we currently focus on the common settings (gabriel_yuyang, 03:22:59) * 2 of bottlenecks tests were executed during plufest which last 1 day and 4 hours, respectively (gabriel_yuyang, 03:23:57) * Issues of hypervisor and rabbitmq were found and action items were assigned on Gabriel to dig deep for the root cause (gabriel_yuyang, 03:24:57) * long duration tests have also been considered in gating CD process (gabriel_yuyang, 03:31:42) * According gating CD process discussion, there are 3 gates: 1) developer 2) lab 3) advanced, LDT has been considered in 2) and 3) and the stability gate (gabriel_yuyang, 03:32:50) * For G release, only developer and lab gates are considered since we are not running LDT on current CI (gabriel_yuyang, 03:33:29) * Bottlenecks Release Plan (gabriel_yuyang, 03:33:56) * Bottlenecks plan to introduce k8s stress testing in G release and investigtion on AI testing/analysis (gabriel_yuyang, 03:34:39) * Bottlenecks will integrate NFVbench to support Traffic Generator and run tests simultaneously in storage network and data plane (gabriel_yuyang, 03:36:10) * we still investigating the possibilities to have more interns for testing results visualization and k8s monitoring (gabriel_yuyang, 03:38:26) * analysis of system under long duration tests should be provided and existing bottlenecks should be advised (gabriel_yuyang, 03:43:09) * AoB (gabriel_yuyang, 03:43:49) * LC3 will be held in the week after next week, one of topic cooperated by Bottlenecks and Barometer projects had been accepted (gabriel_yuyang, 03:44:49) * will go the LC3 for the presentation (gabriel_yuyang, 03:45:05) Meeting ended at 04:11:48 UTC. People present (lines said) --------------------------- * gabriel_yuyang (20) * collabot_ (3) * OPNFV-Gerrit-Bot (2) Generated by `MeetBot`_ 0.1.4