#opnfv-meeting: Weekly Technical Discussion #156
Meeting started by bh526r at 13:00:23 UTC
(full logs).
Meeting summary
- Roll Call (bh526r, 13:00:31)
- Jack Morgan (jentoio,
13:00:48)
- Bin Hu (bh526r,
13:01:04)
- Al Morton (acmacm,
13:01:42)
- Jiaqiang Zhang (bh526r,
13:02:12)
- Liang Chen (bh526r,
13:02:19)
- Qiao Fu (bh526r,
13:02:25)
- Jim Baker (bh526r,
13:02:39)
- Parker Berberian (bh526r,
13:02:48)
- Pierre Lynch (bh526r,
13:02:54)
- Mark Shostak (bh526r,
13:03:35)
- Hongli Zhang (bh526r,
13:03:54)
- Trevor Bramwell (bh526r,
13:04:06)
- OPNFV Lab Infrastructure and CNTT Support (bh526r, 13:05:27)
- Jack create a wiki page to facilitate the
discussion: (bh526r,
13:05:46)
- https://wiki.opnfv.org/display/INF/CNTT+Enablement
(bh526r,
13:05:59)
- Lincoln Lavoie (bh526r,
13:06:29)
- Trevor Cooper (bh526r,
13:07:34)
- Jack went through the wiki page (bh526r,
13:08:13)
- First is Pharos. (bh526r,
13:08:22)
- Pharos Specs needs to be updated (bh526r,
13:08:53)
- After Pharos is modified, will it be Pharos?
Pharos 2.0? or something else? (bh526r,
13:11:16)
- Still be Pharos, (bh526r,
13:12:45)
- RAM, Storage, Leaf networking, number of
services, etc. might be different (bh526r,
13:13:28)
- No upper limit, but minimum requirement
(bh526r,
13:14:01)
- Mark Shostak indicated that 14 was worked out
in CNTT. 14 nodes dedicated nodes. 14 is not minimum, not maximum,
but kind of number preferred. (bh526r,
13:16:33)
- Jack Morgan mentioned hardware requirement
might be a specific topic. (bh526r,
13:17:55)
- So we need to understand leaf-spine networking
requirement. (bh526r,
13:18:55)
- PDF specs will also need to be updated
(bh526r,
13:20:38)
- PDF is very very hardware specific, including
MAC address etc (bh526r,
13:25:06)
- SDF covers IP and other components for
deployment (bh526r,
13:25:58)
- Cedric Ollivier (bh526r,
13:26:45)
- China Mobile has a similar definition
LLD (bh526r,
13:29:28)
- PDF needs to add support for Airship
installer. (bh526r,
13:32:36)
- The next is lab space for CNTT (bh526r,
13:33:37)
- https://gerrit.opnfv.org/gerrit/gitweb?p=pharos.git;a=tree;f=config/pdf;hb=refs/heads/master
(bramwelt,
13:35:19)
- UNH is working on it (bh526r,
13:35:59)
- The third is SDF (bh526r,
13:36:25)
- The historical problem is we had 50+
scenarios (bh526r,
13:37:16)
- bramwelt add's link to example of work updating
PDF (bramwelt,
13:37:21)
- https://gerrit.opnfv.org/gerrit/#/c/pharos/+/49213/
(bramwelt,
13:37:24)
- Details of hardware requirement from CNTT will
be a topic for next week (bh526r,
13:48:33)
- AOB (bh526r, 14:02:13)
- Meeting adjourned (bh526r,
14:02:20)
Meeting ended at 14:02:24 UTC
(full logs).
Action items
- (none)
People present (lines said)
- bh526r (41)
- bramwelt (3)
- collabot (3)
- acmacm (1)
- jentoio (1)
Generated by MeetBot 0.1.4.