#opnfv-meeting: Weekly Technical Discussion #156

Meeting started by bh526r at 13:00:23 UTC (full logs).

Meeting summary

  1. Roll Call (bh526r, 13:00:31)
    1. Jack Morgan (jentoio, 13:00:48)
    2. Bin Hu (bh526r, 13:01:04)
    3. Al Morton (acmacm, 13:01:42)
    4. Jiaqiang Zhang (bh526r, 13:02:12)
    5. Liang Chen (bh526r, 13:02:19)
    6. Qiao Fu (bh526r, 13:02:25)
    7. Jim Baker (bh526r, 13:02:39)
    8. Parker Berberian (bh526r, 13:02:48)
    9. Pierre Lynch (bh526r, 13:02:54)
    10. Mark Shostak (bh526r, 13:03:35)
    11. Hongli Zhang (bh526r, 13:03:54)
    12. Trevor Bramwell (bh526r, 13:04:06)

  2. OPNFV Lab Infrastructure and CNTT Support (bh526r, 13:05:27)
    1. Jack create a wiki page to facilitate the discussion: (bh526r, 13:05:46)
    2. https://wiki.opnfv.org/display/INF/CNTT+Enablement (bh526r, 13:05:59)
    3. Lincoln Lavoie (bh526r, 13:06:29)
    4. Trevor Cooper (bh526r, 13:07:34)
    5. Jack went through the wiki page (bh526r, 13:08:13)
    6. First is Pharos. (bh526r, 13:08:22)
    7. Pharos Specs needs to be updated (bh526r, 13:08:53)
    8. After Pharos is modified, will it be Pharos? Pharos 2.0? or something else? (bh526r, 13:11:16)
    9. Still be Pharos, (bh526r, 13:12:45)
    10. RAM, Storage, Leaf networking, number of services, etc. might be different (bh526r, 13:13:28)
    11. No upper limit, but minimum requirement (bh526r, 13:14:01)
    12. Mark Shostak indicated that 14 was worked out in CNTT. 14 nodes dedicated nodes. 14 is not minimum, not maximum, but kind of number preferred. (bh526r, 13:16:33)
    13. Jack Morgan mentioned hardware requirement might be a specific topic. (bh526r, 13:17:55)
    14. So we need to understand leaf-spine networking requirement. (bh526r, 13:18:55)
    15. PDF specs will also need to be updated (bh526r, 13:20:38)
    16. PDF is very very hardware specific, including MAC address etc (bh526r, 13:25:06)
    17. SDF covers IP and other components for deployment (bh526r, 13:25:58)
    18. Cedric Ollivier (bh526r, 13:26:45)
    19. China Mobile has a similar definition LLD (bh526r, 13:29:28)
    20. PDF needs to add support for Airship installer. (bh526r, 13:32:36)
    21. The next is lab space for CNTT (bh526r, 13:33:37)
    22. https://gerrit.opnfv.org/gerrit/gitweb?p=pharos.git;a=tree;f=config/pdf;hb=refs/heads/master (bramwelt, 13:35:19)
    23. UNH is working on it (bh526r, 13:35:59)
    24. The third is SDF (bh526r, 13:36:25)
    25. The historical problem is we had 50+ scenarios (bh526r, 13:37:16)
    26. bramwelt add's link to example of work updating PDF (bramwelt, 13:37:21)
    27. https://gerrit.opnfv.org/gerrit/#/c/pharos/+/49213/ (bramwelt, 13:37:24)
    28. Details of hardware requirement from CNTT will be a topic for next week (bh526r, 13:48:33)

  3. AOB (bh526r, 14:02:13)
    1. Meeting adjourned (bh526r, 14:02:20)


Meeting ended at 14:02:24 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. bh526r (41)
  2. bramwelt (3)
  3. collabot (3)
  4. acmacm (1)
  5. jentoio (1)


Generated by MeetBot 0.1.4.