#opnfv-promise: Promise
Meeting started by GeraldK at 13:02:35 UTC
(full logs).
Meeting summary
- Roll call (GeraldK, 13:02:40)
- Gerald (GeraldK,
13:03:47)
- Arturo M (ArturoM,
13:04:00)
- Masahito Muroi (masa) (masahito,
13:04:11)
- Bertrand Souville (bertys,
13:04:33)
- Shintaro Mizuno (shintaro,
13:04:54)
- Demo of current Blazar's host reservation (GeraldK, 13:06:29)
- Kobayashi-san (hiro) presents Blazar
project (GeraldK,
13:07:44)
- it's former name is climate. (GeraldK,
13:08:55)
- there can be different plugins to attach
resources, currently there is only the one for Nova (GeraldK,
13:09:12)
- with some workarounds, Blazar can be installed
with latest devstack (GeraldK,
13:10:33)
- Pierre from Chameleon project is fixing a
bug (GeraldK,
13:11:38)
- Hiro has drafted a detailed installation manual
explaining all steps required to demo Blazar (GeraldK,
13:13:21)
- there is a host aggregate "freepool" for Blazar
which is exclusively managed by Blazar (GeraldK,
13:14:25)
- time options can be specified when creating a
lease (GeraldK,
13:17:09)
- default end time is 24h after start time
(GeraldK,
13:17:38)
- ids are being created for lease and
reservation (GeraldK,
13:18:25)
- Manual and test report will be shared after
this call (GeraldK,
13:26:50)
- Hiro is in contact with people from Chameleon
project (GeraldK,
13:28:09)
- Ashiq: what is the different between
reservation and lease? (GeraldK,
13:28:21)
- lease is a set of reservations. start time and
end time are associated with the lease. (GeraldK,
13:28:52)
- Reservation unit can contain multiple host
information, e.g. one reservation for host, one for storage. the
group of the reservations is then managed by the lease (GeraldK,
13:30:26)
- Ashiq asks about current activity and status of
Chameleon project (GeraldK,
13:31:00)
- Chameleon project is updating test scripts for
Blazar (GeraldK,
13:31:55)
- Arturo: the demo was based on Newton release.
some re-basing and code fixing needed to make the demo work.
(GeraldK,
13:34:21)
- OpenStack Product WG (GeraldK, 13:52:37)
- https://etherpad.opnfv.org/p/promise_gap_analysis
(GeraldK,
13:53:23)
- the gap analysis is based on the template from
another existing user story (GeraldK,
13:54:32)
- Gerald will reach out to Madhu to finalize the
user story (GeraldK,
13:55:59)
- Update to contributor list (GeraldK, 13:58:48)
- people interested in becoming contributors to
Promise pls send an email to the tech-discuss ML with tag
[Promise] (GeraldK,
13:59:26)
- Yoshiyuki-san confirms that HPE will join the
activities and commit some code (GeraldK,
14:01:01)
Meeting ended at 14:02:02 UTC
(full logs).
Action items
- (none)
People present (lines said)
- GeraldK (31)
- collabot` (3)
- ArturoM (1)
- shintaro (1)
- r-mibu (1)
- masahito (1)
- bertys (1)
Generated by MeetBot 0.1.4.