- roll call (dmcbride, 14:11:07)
- David McBride (dmcbride,
14:11:12)
- schedule review (dmcbride, 14:11:22)
- TSC approved change to Hunter schedule. Hunter
8.1 is moved two weeks to June 28 to avoid overlap with Plugfest.
Hunter 8.2 is cancelled. (dmcbride,
14:12:40)
- Iruya planning (dmcbride, 14:12:52)
- TSC is still determining how to proceed with
Iruya. (dmcbride,
14:13:39)
- should we begin a new release cycle
immediately, or wait until we have greater clarity from CNTT on
profile defintions. (dmcbride,
14:14:17)
- should we change the cadence? Longer cadence
may allow us to include CNTT profile implementations. Another
possibility is a short cadence release, followed by another release
which would include the profile implementations. (dmcbride,
14:16:18)
- another consideration is the status of
installer base. Several projects are without an installer, since
Apex will not be available after Hunter. (dmcbride,
14:17:59)