#opnfv-testperf: Testperf Weekly Call 20180322
Meeting started by gabriel_yuyang at 15:00:52 UTC
(full logs).
Meeting summary
- Roll Call (gabriel_yuyang, 15:01:23)
- Rex (mj_rex0,
15:01:45)
- Gabriel Yu (gabriel_yuyang,
15:01:54)
- Linda Wang (LindaWang,
15:02:07)
- Eddy Raineri (eraineri,
15:02:09)
- Trevor Bramwell (bramwelt,
15:02:16)
- Julien (Julien-zte,
15:04:38)
- Alec (Alec22,
15:04:50)
- Gabriel has Broadcast the test plan and report
to the community, and let people be familiar first, then develop our
cooperation plan (gabriel_yuyang,
15:05:12)
- Rex send out email to David to see if there is
any additional comments (gabriel_yuyang,
15:05:29)
- https://wiki.opnfv.org/display/meetings/Test+Working+Group+Weekly+Meeting
(gabriel_yuyang,
15:05:39)
- test result page updates for Fraser stable branch (gabriel_yuyang, 15:07:02)
- 2 options for the test results automation:1)
modify results container yaml; 2) relent to modify the yaml through
container (gabriel_yuyang,
15:13:38)
- ACTION: Jace send
details to David ad Trevor (gabriel_yuyang,
15:13:54)
- Testperf topics/planned discussion in ONS LFN dev forum (gabriel_yuyang, 15:17:14)
- George suggest we add topic in breakout session
for hacking (gabriel_yuyang,
15:18:37)
- https://wiki.lfnetworking.org/display/LN/OPNFV+Breakout+at+LFN+Developer+Forum
(gabriel_yuyang,
15:19:27)
- Pierre prefer to have a meeting with ETSI and
LFN cooperations (gabriel_yuyang,
15:22:14)
- Gabriel and Alec will present the long duration
test and need to have other PTLs feedback their slides (gabriel_yuyang,
15:24:55)
- Macros for installer ci status (gabriel_yuyang, 15:26:21)
- 3 main steps for daily test: 1) installer
deploy and install 2) functest test 3)yardstick test (gabriel_yuyang,
15:27:50)
- need to separate failures in the above 3
catagories (gabriel_yuyang,
15:28:13)
- Gabriel suggest Serena to organize F2F meeting
about the macros gathering testing and installer guys (gabriel_yuyang,
15:44:45)
- Gabriel comments about the time stamps that
some testing projects already have testing dates recorded
(gabriel_yuyang,
15:45:44)
- Rex ask if the results created by the macros
could be shown in Test results (gabriel_yuyang,
15:47:06)
- http://testresults.opnfv.org
(gabriel_yuyang,
15:47:31)
- http://testresults.opnfv.org/test
is for collected data (Julien-zte,
15:48:01)
- Julien note that reporting page could fetch the
installer results too (gabriel_yuyang,
15:49:40)
Meeting ended at 15:56:10 UTC
(full logs).
Action items
- Jace send details to David ad Trevor
People present (lines said)
- gabriel_yuyang (25)
- Julien-zte (3)
- collabot` (3)
- bramwelt (2)
- LindaWang (1)
- mj_rex0 (1)
- Alec22 (1)
- eraineri (1)
Generated by MeetBot 0.1.4.