#opnfv-vswitchperf: vswitchperf

Meeting started by SRao at 16:03:18 UTC (full logs).

Meeting summary

  1. Development Update (SRao, 16:03:27)
    1. Al Morton (acm, 16:04:14)
    2. Need help with Build process for Jenkins - failures are frequent (acm, 16:04:55)
    3. ACTION: Sridhar to connect Mars with Releng-team (SRao, 16:05:55)
    4. Resource were reserved for Gambia - that could be one of the reasons for the failures. (SRao, 16:06:27)
    5. RH uses beaker to load and install non-corrupted OS (acm, 16:09:03)
    6. down;load new image for install, make a bootable USB, with console access, boot from USB (acm, 16:10:16)
    7. may need to set BIOS to USB-first in boot order. (acm, 16:11:01)
    8. we need action because OS on Nodes 1 and 2 are corrupted. (acm, 16:11:55)
    9. One slave running on node-3: Ensure that this slave is running correctly. (SRao, 16:12:15)
    10. SRIDHAR has opened a JIRA ticket for this - but not sure what we need to request(?) (acm, 16:12:39)
    11. Create one more slave for node-1 and configure the master for use the new slave too (SRao, 16:12:42)
    12. Configure in the master to use these slaves First try slaves in Intel Pod-12 then Try slave in Ericssson (SRao, 16:13:19)
    13. Mars to try Node-1 and Node-2 with new kernel. (SRao, 16:15:03)
    14. prioritizing development to match list in Demo Proposal for ONS-2019 (acm, 16:17:02)
    15. Live results from T-Rex and Spirent are implemented - Patch to be submitted (SRao, 16:27:57)


Meeting ended at 16:42:38 UTC (full logs).

Action items

  1. Sridhar to connect Mars with Releng-team


People present (lines said)

  1. SRao (10)
  2. acm (8)
  3. collabot` (3)


Generated by MeetBot 0.1.4.