#opnfv-yardstick: Bottlenecks Weekly Meeting 31st August

Meeting started by gabriel_yuyang at 01:10:44 UTC (full logs).

Meeting summary

    1. Gabriel (gabriel_yuyang, 01:10:52)

  1. vnf testing cooperation in Yardstick (gabriel_yuyang, 01:11:59)
    1. Ace has provide some reference code for the scale up (gabriel_yuyang, 01:14:32)
    2. currently some preliminary results are provided and some issues for the deployments (gabriel_yuyang, 01:15:19)
    3. the scaling up operations are done by using heat (gabriel_yuyang, 01:16:48)
    4. both mem and cpu are able to be scaled up (gabriel_yuyang, 01:17:23)
    5. Ross suggest we start with baremental scaling test (gabriel_yuyang, 01:25:14)
    6. test trex too (gabriel_yuyang, 01:25:50)
    7. Ace ask about the POD description in trex_baremental_scale_up.yaml (gabriel_yuyang, 01:29:01)
    8. https://git.opnfv.org/yardstick/tree/samples/vnf_samples/nsut/acl/tc_baremetal_rfc2544_ipv4_1rule_1flow_64B_trex_scale_up.yaml baremetal scale-up test (gabriel_yuyang, 01:33:24)
    9. https://git.opnfv.org/yardstick/tree/nsb_setup.sh (gabriel_yuyang, 01:33:24)
    10. https://git.opnfv.org/yardstick/tree/ansible/ubuntu_server_baremetal_deploy_samplevnfs.yml (gabriel_yuyang, 01:33:25)
    11. for VLAN providers networks, TRex external TG must be manually added to the same VLAN on the TOR switch (gabriel_yuyang, 01:35:26)

  2. stress testing (gabriel_yuyang, 01:36:22)
    1. 2 intern projects are about to be started after Sep 1st (gabriel_yuyang, 01:38:27)
    2. yardstick have supported baremetal VNF scale-up test. (gabriel_yuyang, 01:38:48)
    3. Bottlenecks will try to do some baremetal node scale-up test (gabriel_yuyang, 01:39:13)
    4. ACTION: Ace will ask Deepak if Vacl need the support of DPDK multiqueue. (gabriel_yuyang, 01:39:31)
    5. netperf will collect some KPI such like cpu percentage (gabriel_yuyang, 01:56:28)
    6. The monitoring Stress Testing intern project will do some Prometheus integrate. (gabriel_yuyang, 01:56:42)
    7. The poll of project meeting slot is already over its deadline (gabriel_yuyang, 01:57:12)
    8. ACTION: gabriel will re-send the email and ask the interns to vote (gabriel_yuyang, 01:57:32)
    9. 2 other potential candidate apply for Bottlenecks intern projects (gabriel_yuyang, 01:58:07)


Meeting ended at 01:58:43 UTC (full logs).

Action items

  1. Ace will ask Deepak if Vacl need the support of DPDK multiqueue.
  2. gabriel will re-send the email and ask the interns to vote


People present (lines said)

  1. gabriel_yuyang (36)
  2. OPNFV-Gerrit-Bot (4)
  3. collabot (3)


Generated by MeetBot 0.1.4.