- Dave Wallace (dwallacelf,
14:03:16)
- Agenda bashing (mackonstan, 14:03:19)
- Juraj Linkeš (jlinkes,
14:03:26)
- Vratko Polak. (vrpolak,
14:03:29)
- Peter Mikus (pmikus,
14:04:16)
- FD.io CSIT lab infrastructure (up to 15min) (mackonstan, 14:04:27)
- Maciek: new HW should have arrived, at least
partially (mackonstan,
14:06:14)
- Mohammed: in fact all HW arrived, servers with
motherboards, Processors, NICs (mackonstan,
14:06:37)
- Mohammed: build servers already racked and
installed (mackonstan,
14:07:08)
- Mohammed: awaiting low level design for
configuration the testbeds (mackonstan,
14:07:30)
- Mohammed: 14 x clx-8280, 6 x 6252N (mackonstan,
14:10:41)
- Maciek: proposal to use 6252N on SUTs for
2n-clx, for consistency, vs. mixing 6252N and 8280 on SUTs.
(mackonstan,
14:16:40)
- Vratko: +1 (mackonstan,
14:16:45)
- Mohammed: number of questions re Linux and disk
partitioning/RAID. Will send email to the list. (mackonstan,
14:22:52)
- Mohammed: failed processors, skx, need to
confirm RMA procedure. Will send email to Trishan, Maciek, Ray
Kinsella. (mackonstan,
14:23:39)
- Maciek: will push patch with proposed clx
testbed setup to gerrit and announce on csit-dev (mackonstan,
14:24:48)
- Inputs from LFN and FD.io projects (mackonstan, 14:24:53)
- VPP (mackonstan, 14:25:09)
- Dave: vpp v19.01.3 published last
Friday. (mackonstan,
14:25:43)
- Peter: heard from Jan that csit-1901.3 tests
are complete. Report to be generated. (mackonstan,
14:26:19)
- Dave: vpp v19.04.2 is to be published by
eow. (mackonstan,
14:26:40)
- Dave: v19.08 f0 milestone is next Wed
31-Jul (mackonstan,
14:27:07)
- The name of the new gating job is:
vpp-csit-verify-api-crc-{stream} (vrpolak,
14:30:09)
- Dave: vpp call yesterday, discussed and agreed
to start running vpp-csit-verify-api-crc*, with voting, job starts
on 30-Jul, if false positives handle with manual override
(mackonstan,
14:30:35)
- HC (mackonstan, 14:31:59)
- still open is how to handle orphaned L1 KWs
used by HC, as HC tests got now out of sync with VPP master and not
running - discussion on the list. (mackonstan,
14:34:08)
- Maciek to start thread on csit-dev (mackonstan,
14:34:42)
- TSC (mackonstan, 14:35:04)
- no updates (mackonstan,
14:35:13)
- Operational status (mackonstan, 14:35:24)
- trending analytics job is running out of
memory, so trending graphs results not displayed (mackonstan,
14:36:37)
- Vratko: increased the memory few times but
still out of memory, most likely due to excessive data produced by
tests due to using PAPI vs. VAT (mackonstan,
14:37:24)
- waiting for Tibor to have a proper look, Tibor
is back next week (mackonstan,
14:37:39)
- API coverage - Vratko: based on verify-api-crc
work now have a good view of api's used by csit, but it's early
days, once we enable api-crc gating job, this will drive api
coverage evaluation (mackonstan,
14:39:46)
- VPP code performance (mackonstan, 14:40:17)
- need trending analytics to work again to
compare and see if any anomalies (mackonstan,
14:40:33)
- Releases (mackonstan, 14:40:42)
- Dave: working on tcp tests for 1908, some risk
due to PTO in the way (mackonstan,
14:42:15)
- Dave: refactoring wrk tests (mackonstan,
14:42:35)
- Dave: not planning QUIC tests. (mackonstan,
14:42:41)
- VAT-to-PAPI: Andrej: issues with LISP but fixed
now (issue was with VAT not checking retval, and PAPI does, some
refactoring) (mackonstan,
14:43:57)
- VAT-to-PAPI: policer wip, tap wip. (mackonstan,
14:47:00)
- VAT-to-PAPI: scale tests still running on
VAT (mackonstan,
14:47:46)
- Arm - Juraj: dev and perf tests, not done yet,
but very close, need to clean up images, aiming to have it working
in time for 1908. Currently running arm mrr-daily, but failing at
the moment, patch wip. (mackonstan,
14:49:31)
- Arm - Juraj: device tests, fixing executing
image. (mackonstan,
14:50:39)
- Arm - Juraj: device tests, only one server
right now, looking to add 2nd server. (mackonstan,
14:52:35)
- Arm - Juraj: device tests going ahead with 1
server for csit-vpp-verify non-voting jobs for now. Need 2nd server
to do the same for vpp-csit-verify (mackonstan,
14:53:11)
- evelopments (mackonstan, 14:53:55)
- Developments (mackonstan, 14:54:02)
- move to Python 3.5 (post PAPI migration): need
to start this post pulling the branch for 1908 (mackonstan,
14:55:29)
- Dave: VPP is already working on this: Paul,
Naveen, Ole. (mackonstan,
14:55:52)
- New RF tags proposal - looking for finalize
this shortly, but implementation post 1908 (mackonstan,
14:56:53)
- L1 KWs alignment between -func/-dev and -perf -
Peter: setup, teardown aligned, most tests are too, few test
specific Kws in progress, see updated google docs (mackonstan,
14:58:32)
- New tests (mackonstan, 14:59:39)
- IPsec scale tests - Peter: added 40k and 60k
tests, after verifying vpp fix from Neale (mackonstan,
15:00:01)
- VXLAN tests on 2-node - Peter: tests running
and reviewing the results (mackonstan,
15:00:19)
- NFV density - IPsec - Peter: in 3-node setup,
also going up to 40k and 60k over multiple containers (mackonstan,
15:01:35)
- TRex (mackonstan, 15:02:15)
- Vratko: TRex running now with HDRhistogram,
will be collecting the data, and in the future will process.
(mackonstan,
15:02:46)
- https://drive.google.com/file/d/1wu-ZxrFoiaLFtWdxHrkQO-pzgk6ysa8I/view?usp=sharing
(pmikus,
15:03:25)
- Maciek on PTO from next week for 2.5
weeks (mackonstan,
15:04:07)
Meeting ended at 15:04:11 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (59)
- collabot` (4)
- pmikus (2)
- vrpolak (2)
- dwallacelf (1)
- jlinkes (1)
Generated by MeetBot 0.1.4.