#fdio-csit: CSIT Project Meeting
Meeting started by mackonstan at 15:05:37 UTC
(full logs).
Meeting summary
-
- Jan Gelety (jgelety,
15:05:39)
- Tibor Frank (tifrank,
15:05:41)
- Juraj Linkeš (jlinkes,
15:05:42)
- Agenda bashing (mackonstan, 15:05:50)
- Vratko Polak. (vrpolak,
15:05:52)
- Inputs from projects - VPP (mackonstan, 15:06:12)
- Andrew, RC2 almost ready. (mackonstan,
15:06:35)
- Releases CSIT-2101 (mackonstan, 15:07:07)
- today is RC2 (mackonstan,
15:07:39)
- Tibor, many RC1 test dry runs executed
(mackonstan,
15:07:57)
- Tibor, interim results in draft report
version (mackonstan,
15:09:45)
- https://docs.fd.io/csit/master/report/vpp_performance_tests/packet_throughput_graphs/ip4.html
(mackonstan,
15:09:48)
- Dave Wallace (dwallacelf,
15:09:58)
- Tibor, comparison tables are also being
populated incl. 2009.0 retest (mackonstan,
15:11:15)
- Jan, Geneve tests still under review,
addressing last comments (mackonstan,
15:12:07)
- Vratko, nat44ed throughput tests and ip6-rnd
and ip4-rnd are under review (mackonstan,
15:12:50)
- Juraj, 2n-tx2 testbed is operational, all
working. (mackonstan,
15:14:19)
- Tibor, report TODO email sent out. (mackonstan,
15:16:10)
- Maciek, Vratko: methodology needs to be updated
for nat44ed throughput, ip4- and ip6-rnd testing. (mackonstan,
15:16:47)
- Releases CSIT-2009 (mackonstan, 15:17:48)
- Dave, v20.09.01 maintenance rls target
17-Feb. (mackonstan,
15:18:56)
- (correction) Davee, VPP v20.09.01 maintenance
rls target 17-Feb (mackonstan,
15:19:25)
- Physical Infrastructure (mackonstan, 15:19:34)
- Physical Infrastructure - FD.io DC move in Jan/Feb 2021 and lab extension in 2021. (mackonstan, 15:31:34)
- (mackonstan,
15:31:46)
- Maciek, agreed on a call to ask Vexxhost about
routing topology and packet forwarding between YUL1 and MTL1,
assuming MTL2 is migrated in one step, stage-1 (mackonstan,
15:33:34)
- Maciek, agreed to set a move date for MTL2 for
11-Feb-2021, 1 day after report publish (mackonstan,
15:40:18)
- Maciek, re MTL1 (4 racks), balance the required
work and strive to make the server move transparent to project
operations (mackonstan,
15:45:19)
- Will produce draft proposals for MTL1 move, in
the patch, review on the next week call (mackonstan,
15:47:13)
- https://gerrit.fd.io/r/c/csit/+/30662
(mackonstan,
15:47:23)
- Virtual Infrastructure, CI/CD (mackonstan, 15:47:39)
- Juraj, i40e dpdk driver, sporadic failures on
arm and x86, created an entry in linux kernel bugzilla (mackonstan,
15:51:49)
- Maciek, opening the ticket in Intel IPS system
to speed things up (mackonstan,
15:52:07)
- Juraj, q to Dave how is the Centos8 docker
image generation going (mackonstan,
15:53:06)
- Dave, still a todo, hoping to make progress
this week\ (mackonstan,
15:53:30)
- Dave, added more nomad monitors following
outages on 4-/5-jan (mackonstan,
15:55:11)
- Dave, using WxT "jenkins-healthcheck" channel
for monitoring results, as an interim (mackonstan,
15:57:39)
- Dave, propose to use the same ping monitor
scripts for upcoming DC move (mackonstan,
15:58:24)
- Dave, jenkins parameterized work has been
merged, going production soon (mackonstan,
15:59:29)
Meeting ended at 16:00:23 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (37)
- collab-meetbot (4)
- jgelety (1)
- tifrank (1)
- jlinkes (1)
- vrpolak (1)
- dwallacelf (1)