#fdio-meeting: FD.io CSIT project meeting
Meeting started by mackonstan at 15:01:51 UTC
(full logs).
Meeting summary
-
- Peter Mikus (pmikus,
15:01:56)
- Tibor Frank (tifrank,
15:02:00)
- Vratko Polak. (vrpolak,
15:02:02)
- mackonstan (mackonstan,
15:02:09)
- Agenda bashing (mackonstan, 15:03:18)
- Inputs from projects: VPP (mackonstan, 15:03:55)
- no news (mackonstan,
15:04:09)
- Inputs from projects: VSAP (mackonstan, 15:04:17)
- Fan Zhang (fan_zhang,
15:04:21)
- Dave: no inputs (mackonstan,
15:04:22)
- Inputs from projects: TSC (mackonstan, 15:04:40)
- Juraj Linkeš (jlinkes,
15:04:52)
- Dave Wallace (dwallacelf,
15:04:58)
- Maciek: 2022 lab extension budget guesstimates
provided to Trishan, based on discussion on CSIT calls (mackonstan,
15:06:46)
- New or refactored tests - E810 flow "offload" tests (mackonstan, 15:07:10)
- Fan: will follow up on the email thread on
csit-dev mailer (mackonstan,
15:09:00)
- Releases CSIT-2110 (mackonstan, 15:11:18)
- Tibor, confirmed that job_specs adjustments
worked, all iterative MRR tests < 12hrs (mackonstan,
15:16:51)
- Tibor, rls2110 testing is going well, 5-10
iterative test runs completed, draft report will be updated with new
data (replacing rc2 data) later today (mackonstan,
15:19:09)
- Vratko, rc2 analysis picked up two regressions
vhost and ipsec (library update), waiting for rls test resuls to
confirm (mackonstan,
15:19:45)
- Tibor report update, some static content is
still missing, see the TODO list distributed to csit-dev last week
Wed 278-Oct (mackonstan,
15:21:28)
- s/Wed 278-Oct/Wed 27-Oct/ (mackonstan,
15:23:32)
- Physical Infrastructure (mackonstan, 15:23:49)
- Virtual Infrastructure, CI/CD (mackonstan, 15:24:09)
- Dave, packagecloud issue last Fri, otherwise no
issues. (mackonstan,
15:24:44)
- Dave, pushed vpp docs to S3 (mackonstan,
15:26:48)
- Dave, historical data currently stored in Nexus
to be archived to S3 - Dave to open the ticket (mackonstan,
15:27:34)
- Dave, building new Docker executor
images (mackonstan,
15:28:23)
- Peter, Maciek, CSIT now got an AWS EC2 account,
initial perf tests executed successfully (mackonstan,
15:30:15)
- Peter, all weekly jobs to be executed under
this new account, all rls2110 tests will be switched shortly
(mackonstan,
15:32:27)
- Trending (mackonstan, 15:34:21)
- Viliam, reporting on daily trending tests
failures, VPP is crashing, RCA in progress (mackonstan,
15:35:16)
Meeting ended at 15:37:15 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (29)
- collab-meetbot` (4)
- pmikus (1)
- tifrank (1)
- vrpolak (1)
- fan_zhang (1)
- jlinkes (1)
- dwallacelf (1)
Generated by MeetBot 0.1.4.