#fdio-meeting: FD.io CSIT Project Meeting

Meeting started by dwallacelf at 15:10:08 UTC (full logs).

Meeting summary

    1. Vratko Polak. (vrpolak, 15:10:15)
    2. Dave Wallace (dwallacelf, 15:10:24)
    3. Tibor Frank (tifrank, 15:10:55)

  1. Agenda Bashing (dwallacelf, 15:11:15)
  2. Inputs From Projects (dwallacelf, 15:12:39)
    1. VPP: RC2 is next Wed (dwallacelf, 15:13:24)
    2. Nothing to report for VSAP or TSC (dwallacelf, 15:13:57)

  3. New/Refactored Tests (dwallacelf, 15:14:15)
    1. Nothing new (dwallacelf, 15:15:02)

  4. VPP RC1 hot patch items (dwallacelf, 15:15:18)
    1. VPP MTU patches are in (no blockers), perf issues under investigation for RCA (dwallacelf, 15:16:14)
    2. Issues may be solved via CSIT workaround, if not VPP changes may be required (dwallacelf, 15:17:09)
    3. DPDK 21.11 is merged to VPP, but no other issues besides MTU related (dwallacelf, 15:18:04)
    4. CSIT setting MTU changes that are too large (VPP rejects); resolution under investigation (dwallacelf, 15:18:40)

  5. CSIT-2202 Release (dwallacelf, 15:19:03)
    1. RC1 testing is almost finished (final run ETA tomorrow) (dwallacelf, 15:19:23)
    2. RC1 dpdk testing complete (dwallacelf, 15:19:35)
    3. RC1 full report should be available tomorrow (including 3 node icelakes) (dwallacelf, 15:20:06)

  6. Physical Infra (dwallacelf, 15:20:26)
    1. ICX testbeds are now running for 2202 Report & Trending (dwallacelf, 15:21:12)
    2. Some Ampere servers have arrived at Vexxhost, but have not been unboxed yet. (dwallacelf, 15:22:39)
    3. ACTION: Dave to open ticket to get preliminary pricing for extra RAM for Ampere Build servers from Vexxhost and follow up with TSC on budget. (dwallacelf, 15:26:14)

  7. Virtual Infra (dwallacelf, 15:26:33)
    1. Fan Zhang (fan_zhang, 15:36:03)
    2. CSIT seeing upload failures causing CSIT jobs to fail every Friday. Does not appear to be the same issue as VPP job timeouts due to git replication failures (dwallacelf, 15:39:09)
    3. Peter moved CSIT docs to S3 storage (dwallacelf, 15:40:23)

  8. Trending (dwallacelf, 15:46:42)
    1. RCA investigations for RC1 under way. No blockers at this point. (dwallacelf, 15:48:10)


Meeting ended at 15:49:30 UTC (full logs).

Action items

  1. Dave to open ticket to get preliminary pricing for extra RAM for Ampere Build servers from Vexxhost and follow up with TSC on budget.