#fdio-meeting: FD.io CSIT Project Meeting

Meeting started by mackonstan at 13:58:17 UTC (full logs).

Meeting summary

    1. mackonstan (mackonstan, 13:58:22)
    2. Vratko Polak. (vrpolak, 14:04:26)

  1. Agenda Bashing (mackonstan, 14:05:20)
  2. Inputs from projects - VPP (mackonstan, 14:05:36)
    1. Andrew, rc1 ready in coupld of hours (mackonstan, 14:05:46)

  3. Inputs from projects - TSC (mackonstan, 14:06:17)
    1. Vratko, call for participation in on-site fd.io events - details on TSC wiki (mackonstan, 14:07:17)

  4. New or being refactored tests - flow tests (mackonstan, 14:07:34)
    1. Maciek, some patches in progress, status TBC by Fan (mackonstan, 14:07:45)
    2. Tibor Frank (tifrank, 14:07:49)
    3. Maciek, re CVL flow device tests, CVL FW and driver updated by Peter, so csit flow test patches should be unblocked (mackonstan, 14:08:54)

  5. VPP and CSIT hot items (mackonstan, 14:09:29)
    1. Maciek, re spectre-bhb - no change in status (mackonstan, 14:09:53)
    2. Maciek, re amd perf results review - waiting for feedback from amd team (mackonstan, 14:10:13)

  6. Release CSIT-2206 (mackonstan, 14:10:27)
    1. Tibor, once vpp rc1 is born, will be pulling the csit branch, and preparing for rc1 single run tests (mackonstan, 14:11:20)
    2. Tibor, job specs and draft report specs are in place (mackonstan, 14:11:52)
    3. Dave Wallace (dwallacelf, 14:16:56)
    4. Deliverables: 100 GbE tests for MLX and CVL, telemetry vpp perfmon and linux perf, CSIT UTI, 3n-alt and 3n-snr (tbc), mlrsearch tunings (better handling of unstable tests lower avg/lower stdev), cvl 100gbe flow tests for gtpu and ipsec. (mackonstan, 14:18:18)

  7. Physical Infrastructure (mackonstan, 14:18:47)
    1. Fan Zhang (fan_zhang, 14:22:37)
    2. Maciek, SuperMicro confirmed back to Vexxhost that are not able to fulfil the rest of the order of 8 chassis+motherboard systems for ICX. (mackonstan, 14:31:08)
    3. Peter, with 2x SNR install, two skx servers got decommissioned. (mackonstan, 14:31:37)

  8. E810 flow "offload" tests (mackonstan, 14:34:56)
    1. Fan, both device and perf tests should be running (mackonstan, 14:35:06)
    2. Fan, ipsec policy tests with flow director (mackonstan, 14:35:30)
    3. https://gerrit.fd.io/r/c/csit/+/36119 IPsec flow perf test (fan_zhang, 14:35:45)
    4. Fan, gtpu tests also (mackonstan, 14:37:00)

  9. Virtual Infrastructure, CI/CD (mackonstan, 14:39:24)
    1. Dave, stable/2206 jobs created (mackonstan, 14:39:46)

  10. Trending (mackonstan, 14:42:27)
    1. Viliam reporting on two new failures, see link to csit-report email (mackonstan, 14:43:03)
    2. https://lists.fd.io/g/csit-report/message/5704 (mackonstan, 14:43:10)


Meeting ended at 14:45:49 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. mackonstan (30)
  2. collab-meetbot (3)
  3. fan_zhang (2)
  4. vrpolak (1)
  5. tifrank (1)
  6. dwallacelf (1)


Generated by MeetBot 0.1.4.