#fdio-meeting: FD.io CSIT Project Meeting
Meeting started by mackonstan at 13:59:11 UTC
(full logs).
Meeting summary
-
- mackonstan (mackonstan,
13:59:16)
- Vratko Polak. (vrpolak,
14:02:05)
- Agenda bashing (mackonstan, 14:02:29)
- Peter Mikus (pmikus,
14:02:32)
- Inputs from projects - VPP (mackonstan, 14:04:29)
- Tibor Frank (tifrank,
14:04:53)
- 36352: ipsec: change wildcard value for any protocol of spd policy
| https://gerrit.fd.io/r/c/vpp/+/36352
(vrpolak,
14:06:36)
- Fan, still working on getting above patch
merged, but currently targeting next rls 2210 (mackonstan,
14:07:33)
- Inputs from projects - TSC (mackonstan, 14:08:29)
- ICX-D Wireguard VPP Perf whitepaper:
https://builders.intel.com/docs/networkbuilders/intel-avx-512-and-intel-qat-accelerate-wireguard-processing-with-intel-xeon-d-2700-processor-technology-guide-1647024663.pdf
(fan_zhang,
14:12:43)
- Maciek, on a hook to provide updated HW lab
CAPEX spend proposal to TSC. Currently mainly looking at MLX 100 GbE
cards (mackonstan,
14:13:04)
- Fan, proposed we look at ICX-D with QAT1.8 that
offers VPP running with up to 50 Gbps per core for wireguard
(mackonstan,
14:13:53)
- Fan, Maciek, evaluate the merit of adding ICX-D
into the FD.io CSIT labs (mackonstan,
14:14:12)
- New or being refactored tests (mackonstan, 14:14:30)
- Fan, E810 flow "offload" tests - device tests,
Marvin is taking over, targeting 2210 rls cycle for completing
this (mackonstan,
14:16:10)
- Fan, E810 flow "offload" tests - perf tests,
all merged now, if possible would like to have them added to
trending tests (mackonstan,
14:19:39)
- Tibor, should have capacity with two of 3n-icx
to run those tests, need to know the quantity of tests and their
approx. duration (mackonstan,
14:20:36)
- Fan, will push a patch with updated job_specs,
add Tibor and Maciek as reviewers (mackonstan,
14:21:29)
- Report CSIT-2206 (mackonstan, 14:22:45)
- Tibor, jenkins was down for 3 days Sat - Mon,
now it's back, but introduced delay to RC2 testing schedule
(mackonstan,
14:23:18)
- Tibor, despite above, still on target to
complete rc2 testing phase by eow, report with 1st data eta
tomorrow (mackonstan,
14:24:06)
- Maciek, nobody knows the reason for jenkins
down, waiting for Dave Wallace and Vanessa to provide post mortem
readout (mackonstan,
14:25:05)
- Vratko, on regressions, already checked rc1,
nothing major spotted, awaiting rc2 results (mackonstan,
14:26:18)
- Vratko, so far only checked Xeons (mackonstan,
14:26:33)
- Maciek, Viliam, will work on updating known
issues in master report, capturing the backlog from 22.02 and the
new ones (mackonstan,
14:28:51)
- Maciek, target to point it to vpp community
before the next call on Tue 28-jun (mackonstan,
14:29:20)
- Tibor, report to do list, see email to
csit-dev (mackonstan,
14:30:17)
- https://lists.fd.io/g/csit-dev/message/4522
(mackonstan,
14:30:19)
- Maciek, 100 GbE tests, let's make sure CVL flow
tests are covered on them, and phy testbeds static content is
update (mackonstan,
14:33:15)
- Maciek, Peter, Vratko, evaluate the multi-core
speedup and verify that we see close to linear speedup (mackonstan,
14:37:27)
- Maciek, re telemetry, hit an issue with VPP cli
`wait` command, that makes some of the csit telemetry results
incorrect. Peter is working on the longer-term resolution.
(mackonstan,
14:40:29)
- Peter, new ICX testbeds are coming online, all
5 racks are now completely full. (mackonstan,
14:42:41)
- Peter, new SNR testbed, awaiting some further
assistance from the Intel team to make use of IPMI for console for
remote operation (mackonstan,
14:44:28)
- Physical Infrastructure (mackonstan, 14:45:03)
- Virtual Infrastructure, CI/CD (mackonstan, 14:45:39)
- Juraj, aside, working with Arm team to work out
the large discrepancy ( 5x ) between PDR and NDR rates (mackonstan,
14:47:49)
- Environment, Framework (mackonstan, 14:48:47)
- Vratko, telemetry issue is another example of
CSIT using CLI vs relying on APIs (mackonstan,
14:51:02)
- Peter, the point is that vpp community needs to
find resources to provide a complete coverage of the telemetry that
CSIT is using, for now we only have access to CLI (mackonstan,
14:54:27)
- Trending (mackonstan, 14:55:04)
- Tibor, added e810 NIC 100 GbE to
trending (mackonstan,
14:56:00)
- Viliam, see for trending failing tests in
email: CSIT failing perf tests for week 25 (06/13 – 06/19)
(mackonstan,
14:58:06)
- https://lists.fd.io/g/csit-report/message/5784
(mackonstan,
14:58:19)
Meeting ended at 14:58:57 UTC
(full logs).
Action items
- (none)
People present (lines said)
- mackonstan (40)
- collab-meetbot` (3)
- vrpolak (3)
- pmikus (1)
- tifrank (1)
- fan_zhang (1)
Generated by MeetBot 0.1.4.