    1. https://docs.releng.linuxfoundation.org/en/latest/meetbot.html (vrpolak, 16:04:34)

  1. CSIT (Maciek) (DaveBarach, 16:04:47)
    1. CSIT-2009 report published on 15-Oct, see announce email from me (mackonstan, 16:05:10)
    2. All but AMD and nat44ed test data are there (mackonstan, 16:06:25)
    3. https://docs.fd.io/csit/rls2009/report/ (mackonstan, 16:06:34)
    4. Ongoing work on: nat44ed cps tunings, gso tests, geneve tests (mackonstan, 16:07:06)
    5. CSIT-2009 RCA update by Vratko, no big enough regressions (< -5%), spent time on some smaller regressions (l2patch, see ticket) (mackonstan, 16:08:02)
    6. Trending update by Vratko, one regression that's not real (introduced by nat44ed tests), side-effect of not trusting TRex when it comes to test time measurement ( <1% change) (mackonstan, 16:08:55)
    7. Vratko, some progressions noticed but not investigated (mackonstan, 16:09:35)

  2. Host Stack (Florin) (DaveBarach, 16:10:52)
    1. various cleanups, to avoid bit-rot (DaveBarach, 16:11:16)
    2. to improve compile time, add {tcp,udp}_packet.h vs. protocol implementation headers (DaveBarach, 16:11:57)
    3. per-worker cut-through sessions. Gives much improved cut-through session setup performance (DaveBarach, 16:12:45)
    4. host stack no longer supports legacy binary API (shared memory) connections. Security measure. (DaveBarach, 16:13:28)
    5. Question: why does dpdk map 128gb of memory? (DaveBarach, 16:14:04)
    6. Damjan talked to Anatoly (dpdk guy) yesterday about that (DaveBarach, 16:14:23)
    7. dpdk maps a huge chunk, then finds an appropriate boundary (DaveBarach, 16:14:57)
    8. host stack can trip over the dpdk etc. (DaveBarach, 16:16:04)
    9. vcl improved handling of out-of-order events. Small cleanups / fixes in addition. (DaveBarach, 16:16:55)

  3. Docs (Ray) (DaveBarach, 16:17:03)
    1. Ray points to Ole... ;-)... (DaveBarach, 16:17:36)

  4. Release Management (Andrew, DaveW) (DaveBarach, 16:18:34)
    1. 21.01 roughly 1 month to [sic] API freeze pre-throttle pull cool-down (DaveBarach, 16:19:31)
    2. Actual release in January, most of a month between RC1 and RC2 (DaveBarach, 16:19:55)
    3. 20.09 one outstanding question: maintenance release 20.09.1 (DaveBarach, 16:20:54)
    4. Any requests for the dot release? Timing? (DaveBarach, 16:21:12)
    5. DaveW suggests that waiting until February would be quite a while since the formal release (DaveBarach, 16:22:08)
    6. 19.08 Job removal in January? (DaveBarach, 16:22:45)
    7. Not planning to do another 19.08 point release. Revisit in December. (DaveBarach, 16:23:10)
    8. Cadence after 21.01: September is tricky due to summer vacation. (DaveBarach, 16:24:36)
    9. Possibly 21.06 and 21.10. (DaveBarach, 16:25:17)
    10. 22.01, etc. (DaveBarach, 16:25:41)

  5. Infra Status (Dave W) (DaveBarach, 16:26:01)
    1. 4 [sic] emergency maintenance ops in the last month (DaveBarach, 16:26:17)
    2. All of the LF instances have increased in capacity (DaveBarach, 16:26:40)
    3. Some positive results from the exercise (DaveBarach, 16:27:01)
    4. Finally root-caused the multiple cherry-pick issues. (DaveBarach, 16:27:23)
    5. Need to reduce the Nomad cluster cleanup interval. (DaveBarach, 16:27:48)
    6. Docker image creation scripts merged into ci-mgmt (DaveBarach, 16:28:18)
    7. Centos-7 job will go away in the next release; removing from master builds later today (DaveBarach, 16:30:26)
    8. Debian 9 is old. Would like to switch to Debian 10 in the 21.0 time frame (DaveBarach, 16:31:04)
    9. DaveB reports > 20 static analysis complaints (DaveBarach, 16:32:47)
    10. Ray reports Intel internal discussion about moving away from Centos-7 (DaveBarach, 16:33:39)
    11. Centos-8 patch validation online (DaveBarach, 16:33:59)

  6. Kubecon (Jerome) (DaveBarach, 16:38:04)
    1. Presenting VPP / Calico integration at Kubecon North America (DaveBarach, 16:38:28)
    2. joint preso between Aloys and the Calico guys (DaveBarach, 16:38:42)
    3. three-way comparison between Calico/VPP, Calico/Linux and Calico/eBPF (DaveBarach, 16:39:13)
    4. expect recording to be available (DaveBarach, 16:39:27)
    5. $50 to join live (DaveBarach, 16:40:12)


Meeting ended at 16:43:42 UTC (full logs).